Project Info  


Line 3 Replacement Program

Proponent:  Enbridge Pipeline Inc.
Phase:  Regulatory Decision-Making
Environmental Assessment Type:  EA by Responsible Authority
MPMO Officer:  Brandon Krauthaker
Status:  Active/In Progress





Project Details    
Project Name: Line 3 Replacement Program
Proponent Name: Enbridge Pipeline Inc.
Phase: Regulatory Decision-Making
Federal Review Status: Active/In Progress
Sector: Pipelines
Environmental Assessment Type: EA by Responsible Authority
Project Location: Alberta, Saskatchewan, Manitoba
Province/Territory:
Alberta, Manitoba, Saskatchewan
Project Description

NB: The National Energy Board is responsible for overseeing the regulatory phase of this project ¿ please refer to the links provided to their website for further information. Enbridge Pipelines Inc. is proposing to replace the majority of the 1,073 km Line 3 crude oil pipeline commencing at the Hardisty Terminal in AB to the Gretna Station located near Gretna, MB. The Project will result in the replaced Line 3 operating at Line 3's original operating capability (760,000 barrels/day). The proposed project would include: the replacement of the existing 863.6 mm pipeline with 914.4 mm pipeline; the addition and replacement of some or all pumps and associated infrastructure and equipment; the addition of tankage at the Hardisty Terminal; and, the decommissioning of the existing pipeline.